A multi-storey data centre development designed to Uptime Institute Tier III. The building comprises 8 levels of data hall of 1,000 sqm each accommodating 4,000 racks. The total GFA is 21,184 sqm. A CLP 132kV substation is provided within the development. JRP is responsible for the MEP design and construction supervision.