4-projects-high-res
Culture & Recreation
Conversion of The Secondary Pool of The Morse Park Swimming Pool Complex into Indoor Heated Pool, Hong Kong
Year
2023
Client
Architectural Services Department

The Morse Park Swimming Pool Complex (MPSP), which was opened in 1970, occupies an area of about 1.665 hectares and comprises an outdoor main pool, a secondary pool, a diving pool, a children’s pool, two toddler’s fun pools and 3 teaching pools.

 

The project is to convert the secondary pool into an heated pool to meet the increasing year–round demand. The project includes a permanent cover and retractable sidewalls or side doors for the secondary pool, construct of a new secondary pool in-situ with provision of heating system, a new outdoor children’s pool, a covered walkway from the exits of the changing rooms to the secondary pool, barrier-free access to the pool so that wheel-chair users and other disabled persons can gain access to the pool and a babycare room.