JRP’s scope of responsibilities included the design work for electrical distribution, lighting, lightning protection, underfloor trunking system, landscape lighting, and central clock system, and for the air conditioning, it included a combination of water cooled, air cooled, fan coil units and ventilated ceilings, depending upon the building location on the rugged terrain, and function requirements and hours of operation.